EDMONTON, ALBERTA–(Marketwired – Dec. 28, 2013) – The Heartland Transmission Project team, AltaLink and EPCOR, announced today that construction on the transmission line is complete and it is in operation.
Source: http://www.marketwired.com/mw/release.do?id=1865448&sourceType=3